Raised at the machine
On a phone or a tablet, by the person who found it, while the part is still in their hand. Photograph attached, job and part number picked from a list rather than typed and an NCR number issued on the spot.
Raise a non-conformance on a phone at the machine, with a photograph attached. Chase it without sending a single email. Close it out with evidence against it. Find any NCR from any year in the time it takes an auditor to finish asking for it.
The product is called RootLog. It is built to your process rather than bought off a shelf, because the firms who need this most are usually the ones whose process does not match anybody's template.
None of this means the system was built badly. It means it was built for ten NCRs a year and is now carrying two hundred.
If your quality manager can tell you roughly how many NCRs are open but not exactly which ones, or if the answer to "when did we last review that corrective action" is a search rather than a screen, the system is being held together by one person's memory. That works right up until that person is off for a fortnight.
Most firms can tell you what they scrapped last month. Very few can tell you what it cost to administer the scrapping: raising the report, walking it round for signatures, chasing the disposition, writing up the corrective action, preparing it all again for the audit.
That time is real, it is paid at a loaded labour rate and it lands on your most experienced people rather than your cheapest. An NCR that takes an hour and a half of somebody's day, ninety times a year, is a fortnight of a senior person gone before you count a single scrapped part.
I have not published a benchmark figure for this, because I have not verified one I would stand behind. What I have built instead is a calculator that uses your own numbers.
Work out your own cost of poor quality. Free, no sign-up, nothing leaves your browser. It shows the quality admin figure separately, which is the one this page is about.
Four stages, each one a screen rather than a form to walk somewhere.
On a phone or a tablet, by the person who found it, while the part is still in their hand. Photograph attached, job and part number picked from a list rather than typed and an NCR number issued on the spot.
What happened to the affected product: scrap, rework, concession, return to supplier, use as is. Quantity recorded, decision attributed to a named person, dated automatically rather than by hand.
Where a corrective action is warranted, it gets an owner, a due date and its own status. What is outstanding and who it is sitting with is a screen anybody can look at, so chasing stops being a person's job.
Closure requires the fields that make it a closure: what was done, by whom, what proved it worked. Everything before it stays in the record, so the history of a decision survives the person who made it.
Two clauses of ISO 9001:2015 sit behind most NCR paperwork. Clause 8.7 covers the control of non-conforming outputs: identifying them, dealing with the affected product and keeping records of what was found, what was decided and who authorised it. Clause 10.2 covers non-conformity and corrective action: reacting to it, evaluating whether the cause needs eliminating, acting, reviewing whether the action worked and retaining records of both the nature of the problem and the results.
Nothing in either clause requires software. A paper system that is filled in properly and can be produced on request is compliant. What software changes is how much effort it takes to keep it that way and how confident you are that it is that way today rather than on the day you last checked.
A revised ISO 9001 is scheduled for publication on 16 September 2026. Based on the draft stages, it is an evolution rather than a rewrite: the process approach, Plan-Do-Check-Act and risk-based thinking all stay, with added emphasis on quality culture and ethical behaviour. A three-year transition period is anticipated, which would run to roughly September 2029 and certification to ISO 9001:2015 remains valid throughout.
Two honest caveats. Until it is published, nobody can tell you exactly what the final text says and anyone who does is guessing. And the transition arrangements are confirmed by accreditation bodies at or around publication, not before. If you are being sold software on the strength of the 2026 revision, ask which specific requirement it addresses. ISO's own committee page is the source worth watching. Checked on 29 August 2026.
Beyond the standard, most of the pressure comes from customers rather than certification bodies. Aerospace and automotive supply chains commonly ask for a structured problem-solving response in a set format and to a set timescale. Where you have to produce that, the value of a proper record is that the information already exists in one place instead of being reassembled from an email chain the week it is due.
None of it is off the table. It is simply more work, so it costs more and takes longer and you should hear that before you spend anything.
Software cannot make a quality system compliant and I will not tell you it can. It holds better records and makes them easier to produce. Whether your process meets the standard is a matter for you and your auditor.
Version one does NCRs and corrective actions properly rather than doing eight things adequately. Document control, calibration, supplier approval and internal audit can be built, but as later phases with their own quotes.
If NCRs are not being raised because nobody wants to raise them, a better form will not change that. It removes the practical excuses. The cultural ones are yours.
As built it exports files you can import elsewhere. Having it push and pull data from your ERP or MRP automatically is a separate phase, quoted separately and worth doing only once the first part is earning its keep.
A four-field NCR log with two people using it is not a system with supplier non-conformances, customer complaint links, three sign-off levels and a structured problem-solving workflow behind it. Quoting one price for both would mean either promising a number I cannot build to, or charging the simple jobs to cover the hard ones.
So the blueprint comes first and it is free. You get the real figure in writing before you commit anything and that figure is fixed once you accept it. It does not move because the work turned out harder than I expected.
Quotes hold for 30 days. The only thing that changes a fixed price is finding that what I received is materially different from what was described. In that case I either requote, which you are free to decline, or withdraw and refund your deposit in full.
What you own at the end. The application, the code and the data, with no licence and no per-user fee. A full export is free on request whenever you ask, whether or not you are paying for support. Ongoing support is optional at £750 a year or £75 a month and the first 30 days are included.
Have a go on a working inspection example. It is live, with made-up data and there is nothing to sign up for.
My trade is quality inspection, twenty years of it, most recently on aerospace engine components. I have raised non-conformances, chased them and sat on the wrong side of an audit looking for a record that existed but could not be found. That is where this comes from.
It means I do not need the process explained from first principles. Containment against corrective action, disposition against root cause, why the effectiveness check is the part everyone skips. That is familiar ground and it shortens the conversation considerably.
There is no team, no account manager and nobody in a call centre. You email me, I answer, I build it. Which is also why I take on a few of these at a time and will tell you early if yours is not a good fit.
A non-conformance report. It is the record you raise when something does not meet requirement: a part out of tolerance, wrong material, a missed process step, a customer rejection.
It records what was found, what was done about the affected product and where necessary what was done about the cause. Some firms call it a non-conformity report or a defect report. The paperwork is the same argument under a different name.
No. It is built to your process, your NCR number format, your disposition options and your sign-off rules.
Off-the-shelf quality software exists and is a reasonable choice for some firms. It usually means changing how you work to suit it and paying per user every month for as long as you use it. If your process is standard, that trade is often worth making and I will say so.
The spreadsheet is fine at holding a list and for a small number of records a year it is genuinely the right tool.
What it cannot do is be opened at the machine by the person who found the problem, stop two people overwriting each other, make waiting visible so things get chased, hold a photograph of the defect against the record, or prove that a closed record was not quietly edited afterwards.
Yes and it is one of the main reasons for raising an NCR from a phone. A photograph taken at the machine, at the moment the problem is found, is worth more in a root cause discussion than a description typed from memory two days later.
Yes and it keeps them apart, which matters. The immediate disposition of the affected product is one thing. Whether the cause needs eliminating is a separate judgement with its own owner, due date and effectiveness check.
Conflating the two is the most common weakness I see in a spreadsheet register, because a single row encourages a single answer.
It makes the records easier to produce and harder to lose. It cannot make your quality system compliant on its own and I would not claim otherwise.
What auditors normally want is evidence that non-conformances are recorded, dispositioned, actioned where required and closed. They also want you to be able to find that evidence when asked. The finding-it part is where most of the pain is and that part software genuinely fixes.
No to both. It is hosted and it runs in a browser. If your staff can open a website, they can use it and there is nothing to install on anybody's machine.
If they are in a spreadsheet or a database, they come across. Historic records are imported so that on day one your history is already there and searchable.
If they are on paper in a filing cabinet, that is a decision worth making deliberately. Most firms import the last year or two and leave the rest on paper, because typing up eight years of forms rarely earns back what it costs.
From £1,950 depending on the size of the job, with no VAT to add and no per-user fees. Optional ongoing support is £750 a year or £75 a month and the first 30 days are included.
Before you commit anything you get a written blueprint, free, saying what it would become, what it would cost and how long it would take. It sometimes says the job is not worth doing.
From two weeks once the quote is accepted. You get a link to try part-way through rather than a surprise at the end.
Your current spreadsheet or paper system carries on untouched until you decide to switch, so there is no week where you are between systems.
A photograph of the paper form, or a screenshot of the spreadsheet register, plus a line or two on how it gets closed out. Within two working days you get a written breakdown: what it would become, how long it would take and exactly what it would cost.
Free whether or not you hire me. No sales call unless you ask for one.